Skip to content
Fitter checking a wood-effect worktop with a long spirit level, a jigsaw resting beside the sink cut-out

Kitchen worktop fitting in Dublin, laminate and solid wood

Laminate and timber worktops cut, jointed and sealed on site, with sink and hob cut-outs, upstands and end caps finished.

5.0 on Google15+ years experience

Getting a price is easy

  1. 1

    Send a few photos

    WhatsApp photos of the room and the order list or supplier plan, if you have one.

  2. 2

    Get a straight answer

    We tell you what the job involves and a price, by message or on the phone.

  3. 3

    Pick a day

    Weekdays or weekends, whichever suits. The price is agreed before any work starts.

What are we assembling?

Step 1 of 2: the job and where it is

Type of job

Step 2 of 2: how to reach you

See our privacy policy.

Thanks, that's with us

We will ring you back to talk through the job. If it is urgent, call 01 230 8966.

Flat Pack Mate is a worktop installation service for kitchens in Dublin and the Greater Dublin Area, Bray included. Our fitters fit laminate and solid wood worktops that you buy, on new units or on a kitchen you are keeping.

Quartz, granite and sintered stone are measured, cut and fitted by the stone company, because their joints and cut-outs are made in the workshop.

Last updated:

Kitchen worktop fitting prices

Laminate worktopsper kitchen, cut and fitted on sitefrom€300
Solid wood worktopsoiled, jointed and fixed to allow movementquoted per job
Extra joints and cut-outsmason's mitres, hob, sink and tap holesquoted per job
Upstands and end capscut, sealed and fixedquoted per job
Old worktop removedtaken off and taken awayquoted per job

Starting price for labour on a standard laminate kitchen. Material prices and stone costs are in our guide to worktop replacement cost.

What every job includes

  • Base units checked level before the worktop is cut
  • Worktops scribed to the wall where it is out of true
  • Mason's mitres cut with a jig and router
  • Joints pulled tight with worktop connector bolts
  • Hob and sink cut-outs marked from the real appliances
  • Every cut edge sealed against water
  • Upstands and end caps fitted and siliconed
  • Offcuts and packaging taken away

What happens before the first cut

A worktop is only as flat as the units under it, so the base units are checked first. Then the worktop lengths are laid out, the joints planned so they avoid the sink and hob, and the sink and hob are checked on site before any cut-out is marked.

  1. 01

    Units levelled

    Base units checked with a long level and adjusted on their legs.

  2. 02

    Joints planned

    Joints placed away from the sink and hob.

  3. 03

    Appliances on site

    Cut-outs marked from the real sink, tap and hob.

  4. 04

    Walls checked

    Back walls checked for bows so the top can be scribed tight.

Which worktops do you fit?

We fit laminate and solid wood worktops, cut and jointed on site. Quartz, granite and other stone tops are templated, cut and fitted by the stone supplier, who brings the slabs ready-made. On a mixed kitchen, such as a laminate run with a stone island, both can work around each other.

Laminate is light and easy to cut, but its chipboard core swells if water reaches a cut edge. Solid wood can be sanded back, but it moves with the seasons and needs oil.

Worktop materials and who fits them

Laminate

Who fits it
Flat Pack Mate
Fitting point
Every cut edge sealed

Solid wood

Who fits it
Flat Pack Mate
Fitting point
Expansion gap and oil on all faces

Quartz, granite, sintered stone

Who fits it
Stone supplier
Fitting point
Templated once units are fixed

Worktop joints: mason's mitre and butt joints

According to Builders Squad's fitting guide, a mason's mitre cuts the first 30 to 35 mm of the joint at 45 degrees, then runs straight. It is cut with a jig and router, and the two halves are pulled together with worktop connector bolts from underneath.

Most runs over about 3 m need at least one joint. Laminate joint edges are sealed before the bolts are tightened. A colour-matched jointing strip is quicker but leaves a visible line.

Worktop joint types

Mason's mitre

Used for
Laminate corners
How it is made
Jig, router and connector bolts

Butt joint

Used for
Solid wood corners
How it is made
Square ends, connector bolts

Jointing strip

Used for
Quick laminate joins
How it is made
Metal strip fixed between lengths

End cap or edging strip

Used for
Exposed laminate ends
How it is made
Glued and trimmed flush

Solid wood: expansion gap, fixings and oil

Solid timber moves with humidity, so it is fitted with a 4 to 5 mm expansion gap to walls and units, butt jointed rather than mitred, and fixed with slotted angle brackets. Every face is oiled before fitting, top, bottom and all four edges, or the top can cup.

A mason's mitre does not allow for timber movement, which is why timber corners are butt jointed. The upstand or tiles hide the gap.

  • 4 to 5 mm gap to walls and tall units
  • Butt joints with connector bolts
  • Slotted angle brackets, not fixed screws
  • Oil on all six faces before fitting
  • Extra oil around the sink and on the end grain

Sink and hob cut-outs

Cut-outs are marked from the sink and hob you have bought, using the template that comes in the box. A drop-in sink sits on the surface. An undermount sink hangs under it, so the cut edge stays on show and has to be finished to suit.

Every cut edge is sealed before the sink or hob goes in, because a swollen corner around a sink cannot be repaired.

  • Sink and hob on site before cutting
  • Cut-outs clear of joints and unit sides
  • Tap hole positions checked against the sink
  • Cut edges sealed before fitting

How far can a worktop overhang?

Builders Squad gives the maximum unsupported overhang as 200 mm for solid wood and 300 mm for 30 mm stone. Past that, a breakfast bar needs corbels, brackets or support legs underneath. A normal worktop front edge overhangs the doors by a small margin only.

Plan seating early, because breakfast bar supports go in before the top.

200 mm

Maximum unsupported overhang, solid wood

Builders Squad

300 mm

Maximum unsupported overhang, 30 mm stone

Builders Squad

4 to 5 mm

Expansion gap for solid wood

Builders Squad

Upstands, splashbacks and finishing

An upstand is a short strip of worktop along the wall that covers the expansion gap. A glass or tiled splashback is a separate trade, fitted after the worktop.

Matching upstandsEnd capsEdging stripsSilicone sealScribed back edgesBreakfast bar supports

Stone worktops: templating and the gap in between

Stone is templated only after the units are fixed and level. According to Worktops Ireland, templating takes about an hour, fabrication 5 to 7 working days and fitting 3 to 5 hours. In that window the kitchen runs without a top, so plan a temporary board or a few days of takeaways.

Kitchenworktops.ie puts the whole stone process at two to three weeks from order to fit. Have the sink, tap and hob chosen before the template visit, because the cut-outs are made in the workshop from that template, according to Worktops Ireland.

The units must not move after templating. Any change to a cabinet, filler or wall after that day can mean a stone top that no longer fits.

Who disconnects and reconnects the sink and hob?

A plumber disconnects and reconnects the water. A gas hob is disconnected and reconnected by a Registered Gas Installer (RGI), who issues a Declaration of Conformance. An induction hob on a new circuit needs a REC registered with Safe Electric, plus a Completion Certificate. The worktop, sink and hob themselves are fitted by our team.

Book the trades for both ends of the job. The rules are in our guide on who connects the hob.

Who connects what on a worktop job in Ireland

Gas hob

Who does it
RGI
Paperwork
Declaration of Conformance

Induction hob circuit

Who does it
REC
Paperwork
Completion Certificate

Taps and water supply

Who does it
Plumber
Paperwork
Tested for leaks

Getting long worktops into Dublin homes

Laminate and timber worktops come in lengths of 3 m and 4.1 m. That is easy in a semi with a straight hall and much harder in a terraced house with a turn in the stairs, or an apartment lift. Measure the lift and the tightest turn before ordering.

When a full length will not go in, it can be cut outside and jointed in the room where the joint looks planned.

  • Lift depth and door height measured
  • Stair turn checked for a 3 m length
  • Parking near the door for unloading
  • Management company told about the delivery

How much does worktop fitting cost in Dublin?

Fitting laminate worktops starts from about €300 for a standard kitchen, labour only. Kitchenworktops.ie lists installing new worktops at €300 and replacing old ones at €450. Worktops Ireland puts quartz and granite at around €450 per linear metre, including supply and fitting.

The fitting price moves with joints, cut-outs, upstands, timber versus laminate, and removing the old top. Most Dublin stone worktop projects come in at €1,900 to €5,500 fitted, according to Worktops Ireland.

What to send for a price

A sketch and a few photos are enough.

  • Photos of the units, front on
  • Run lengths and corners
  • Worktop material and supplier
  • Sink and hob models
  • Whether the old top comes off

Who should fit your worktop?

Three routes to a new worktop, depending on the material.

Stone company

  • Materials: Quartz, granite, sintered stone
  • Corner joints: Made in the workshop
  • Cut-outs: Cut from the template
  • Wait after measuring: 5 to 7 working days
  • Gas, electrics, water: RGI, REC and plumber
Price up front

Flat Pack Mate

  • Materials: Laminate and solid wood
  • Corner joints: Mason's mitre or butt joint
  • Cut-outs: Marked from the real sink and hob
  • Wait after measuring: None, cut on site
  • Gas, electrics, water: RGI, REC and plumber

Doing it yourself

  • Materials: Laminate, usually
  • Corner joints: Jointing strip
  • Cut-outs: Jigsaw, by hand
  • Wait after measuring: None
  • Gas, electrics, water: RGI, REC and plumber

Stone timings from Worktops Ireland, checked November 2026.

How worktop fitting works

  1. 01

    Send photos and sizes

    Photos of the units, run lengths and your chosen worktop.

  2. 02

    Agree price and date

    A fitting price agreed, trades booked either side.

  3. 03

    Cut, joint and fit

    Lengths scribed, joints routed and bolted, cut-outs sealed.

  4. 04

    Finish and clear up

    Upstands, end caps and silicone on, offcuts in the van.

Recent kitchen worktop fitting work

White units with a dark wood-effect worktop along a window wall and a matching island, marble-effect floor tiles
Dark wood-effect worktops on the run and the island
Light marble-effect worktop around a corner with a white sink and a gooseneck tap
Corner run with the sink fitted
Island with a dark worktop in place while wall and tall units are still being fitted
Island worktop down, units going in
Long light worktop over grey utility units with an inset steel sink, a washing machine and a dryer
Utility worktop with the sink fitted

Worktop bought? Get it cut and fitted.

Send photos and run lengths for a price.

From people we have worked for

I can't recommend Alex highly enough! He came to my rescue after a shed had been partially put up and abandoned, leaving me really worried that the structure wasn't secure and could be damaged by the wind. I gave Alex extremely short notice, but despite being incredibly busy, he went out of his way to prioritise me and make sure my shed was secured. He was professional, reliable and did an absolutely amazing job. He even worked late ...

Tasha DalyRecommended on Facebook (Alex Furniture Pro), September 2026

Alex has done 2 projects in my home, and I cannot recommend him enough. he comes when he says he will, the work is *excellent* and a very good price. Highly recommended

Beth MerrimanRecommended on Facebook (Alex Furniture Pro), May 2022

What a fantastic service! I got 4 Ikea wardrobes assembled and they were done so quickly - very clean and tidy workers too. Highly recommend

Linda Moore O'BrienRecommended on Facebook (Alex Furniture Pro), March 2020

Can't recommend Alex highly enough, assembled a wardrobe for me today, great job, great rates, thanks Alex

Gina KeddyRecommended on Facebook (Alex Furniture Pro), February 2020

★★★★★

I struggled to find a carpenter who also had locksmith skills and who would actually show up, so I reached out to Alex for help. Despite his busy schedule and my location, he came out within two days. Alex has done work for me over the ...

D O'SReviewed on Google (Alex handyman), about 2 years ago (as shown in November 2026)

★★★★★

Excellent. Professional and friendly. Came on time. Did a great job. Very neat and tidy.

Ciara O'DwyerReviewed on Google (Alex handyman), about a year ago (as shown in November 2026)

Worktop fitting questions

Do you fit quartz or granite worktops?

No. The stone company templates, cuts and fits stone tops. We can fit and level the units first, ready for the template visit.

Can you fit a worktop on my existing units?

Yes, as long as the units are sound and level. A worktop shows every dip in the units below, so they are checked and adjusted first.

How long does laminate worktop fitting take?

One fitter's breakdown on MyJobQuote allows two days for the worktops on a full kitchen. A short straight run takes less, and every extra mitre, cut-out and upstand adds time.

Do I need to oil a wood worktop after fitting?

Yes. All six faces are oiled before fitting, then the top needs regular re-oiling, more often around the sink.

Who reconnects my hob and sink?

A plumber reconnects the sink. A gas hob needs a Registered Gas Installer, and an induction hob on a new circuit a Safe Electric REC.

Do you work at weekends?

Yes. Saturday and Sunday slots are available as well as weekdays, so the work can fit around your week.

Often booked with kitchen worktop fitting

IKEA kitchen installation

METOD cabinets built, levelled, hung and finished with plinths, cover panels and worktops.

From €1,500

Kitchen door replacement

New doors and drawer fronts hung on your existing cabinets, drilled, aligned and adjusted.

Priced per job

Flat pack assembly

Flat pack beds, wardrobes, desks and storage from any shop, built square, levelled and anchored to the wall.

From €50
01 230 8966WhatsApp
Chat on WhatsApp