

Flat Pack Mate: flat pack assembly in Dublin
Beds, wardrobes, desks and full IKEA orders assembled level and fixed to the wall. Kitchens, media walls, TVs and garden builds too.
Getting a price is easy
- 1
Send a few photos
WhatsApp photos of the room and the order list or supplier plan, if you have one.
- 2
Get a straight answer
We tell you what the job involves and a price, by message or on the phone.
- 3
Pick a day
Weekdays or weekends, whichever suits. The price is agreed before any work starts.
What are we assembling?
Now press send in WhatsApp
Thanks, that's with us
We will ring you back to talk through the job. If it is urgent, call 01 230 8966.
Services
Everything that comes flat in a box, assembled
Flat pack assembly is where most jobs start. The same fitter also does wardrobes, kitchens, media walls, TVs and garden builds.
Flat Pack Mate puts together flat pack furniture across Dublin, Bray and the Greater Dublin Area, and fits the kitchens, wardrobes and media walls that come flat in a box too. Our small team does the work and brings its own tools and the wall fixings that suit Irish walls.
Most jobs are one visit: a bed and a wardrobe for a new bedroom, a home office, or a full IKEA order after a move. The price is agreed before any work starts.
Flat pack assembly prices
Starting prices, set from what Dublin assembly firms and IKEA Ireland publish for the same work. The full breakdown is in our guide to flat pack assembly cost.
What every job includes
- Every part checked against the instructions before the first screw goes in
- Back panels squared and adjustable feet set so doors and drawers run true
- Tall units anchored to the wall with fixings that suit your wall type
- Doors, drawer runners and soft-close hinges adjusted after the build
- All boxes, wrap and polystyrene taken away
- Spare fittings and the Allen key left with you
- Any missing or damaged part pointed out before the build, not after
- A quick run-through before we leave
What happens when we arrive
We check the parts, clear a working space about a metre wider and deeper than the item, and assemble each piece in the room it will live in. Tall units are fixed to the wall before anything goes inside them.
- 01
Parts counted
Every panel and fitting checked against the instruction sheet, so a missing cam lock or dowel shows up before the build, not after.
- 02
Floor protected
A dust sheet goes down and the panels are laid out in build order.
- 03
Built in place
Each item is built in the room where it will stand, so nothing is carried up the stairs fully assembled.
- 04
Wall checked
The wall is checked before any fixing goes in, so the plug suits what is behind the plaster.
What we assemble
If it came flat in a box, it is in scope. That covers bedroom, living room, office and garden furniture, from a single bookcase to a full room assembly after a move.
Any retailer, any brand
Orders from IKEA are covered in detail on the IKEA assembly service page. We build furniture from JYSK, Argos, Harvey Norman, Woodie's, EZ Living, DFS, Wayfair and Amazon. New or second-hand makes no difference, as long as the parts are there.
Wardrobes and PAX systems
Two and three door flat pack wardrobes are the item most often built badly at home, because a racked carcass leaves doors that never line up. IKEA PAX wardrobe assembly has its own page, with the ceiling heights each frame needs.
Garden furniture and trampolines
Rattan sets, benches and storage boxes are built where they will stand. Trampolines, with their nets, anchors and in-ground options, are covered on the trampoline assembly page.
Metal, wooden and plastic sheds need a level base and more time, so they are covered on the garden shed assembly page.
Bed assembly, including ottoman and bunk beds
Beds are quick to build but easy to get wrong. The slats, centre rail and mid-beam carry the mattress, so every bolt is tightened and the frame is checked for rock before the mattress goes on. Ottoman beds need the gas struts that suit your mattress weight.
IKEA sells some beds as separate articles: a MALM frame, its slats and the SKORVA mid-beam each have their own code. Check all three are in the order before the visit, or the bed cannot be finished on the day. For bunk and cabin beds, tell us the ceiling height so the guard rail clearance can be checked before the build starts.
- Divan bases and headboards
- Wooden and metal bed frames
- Ottoman and gas lift beds
- Bunk, cabin and loft beds
- Cots and toddler beds
- Bed dismantling for a move
Desks and home office furniture
Home office jobs are usually a desk, a chair, a pedestal and shelving. Sit-stand desks take longer: the motor cabling is routed before the frame closes, and the desk is run to its top and bottom limits before we leave.
Small office fit-outs are fine too. For anything in a building with a lift, measure the lift door and the inside of the lift first. A lift does not prove the longest panel will turn into it.
- Desks and sit-stand desks
- Office chairs
- Pedestals and filing cabinets
- Shelving and bookcases
Wall anchoring as standard
Every wardrobe, tall bookcase and chest of drawers we build is fixed to the wall, because a tall unit full of clothes can tip when a child climbs a drawer. The anti-tip kit in the box has no wall plugs, so the fixing has to be chosen for your wall.
Anchoring adds about 15 to 30 minutes to a job, going by UK assembly firms' own timings. The time goes on finding what the wall is made of. Dublin houses use at least four wall types, and each one needs a different fixing.
Irish wall types and the fixing each one takes
Solid block or brick
- Where you find it
- 1930s to 1960s semis, older terraces
- Fixing we use
- Masonry plug and screw
Hollow block
- Where you find it
- Many 1970s to 2000s houses
- Fixing we use
- Cavity or long-leg fixings, not standard plugs
Plasterboard on dabs (dot-and-dab)
- Where you find it
- Dry-lined walls in newer homes
- Fixing we use
- Long screw through to the block behind
Timber or metal stud
- Where you find it
- Apartments, timber-frame houses
- Fixing we use
- Screw into the stud, or a spring toggle between studs
What proper assembly looks like
Wobbly flat pack is almost always a build problem, not a furniture problem. Cam locks only grip when the panels meet square. Dowels need glue or a firm seat. A back panel nailed on out of square racks the whole carcass, and the doors show it first.
Level and line
Floors in older Dublin houses are rarely level. Adjustable feet or packers take up the difference, so drawers stay shut and doors hang with even gaps. Units that stand side by side are lined up at the top, not the floor.
Missing or damaged parts
If a panel arrives cracked or a fitting is missing, photograph it with the box label straight away: retailers usually ask for both before they send a replacement. Everything else can still be built on the day. Standard cam locks, dowels and screws are easy to replace, so a missing bag rarely means a second visit for the whole order.
Dismantle, move and rebuild
Moving house is where flat pack gets damaged. Wardrobes and beds are taken down, their fittings bagged and labelled, and rebuilt at the new address. Tell us early if the furniture is going into storage, so the fittings travel with the right panels.
Landlord turnovers and new tenancies are the other common case: several rooms of furniture built or swapped in one visit, often at the weekend.
Apartments, stairs and tight rooms
Flat pack is built in the room where it will stand, so tight stairs are rarely a problem. The limits are long boxes in lifts, parking for a van, and management company rules. A packed PAX frame is 210 cm long and can weigh almost 50 kg.
Check your building's rules on working hours and lift booking before the visit. Some management companies want notice, or a lift blanket, before furniture moves through common areas. If parking is permit-only, a visitor permit saves a long carry.
How it works
How flat pack assembly works
The same four steps for one bookcase or a full IKEA order after a move.
- 01
Send the order
Ring or use the form with the order list, product links or a photo of the boxes, plus the floor and access.
- 02
Agree a price and a time
You get a fixed price for the whole job and a slot, weekdays or weekends.
- 03
Build, level and anchor
Each item is built in place, levelled, fixed to the wall and adjusted.
- 04
Clear up and check
Packaging goes in the van, and you check every door and drawer before we leave.
Why Flat Pack Mate
Six things you can count on
Any shop, new or used
IKEA, JYSK, Argos, Woodie's, Amazon or second-hand. If it came flat, it is in scope.
Packaging taken away
Every box, wrap and block of polystyrene goes in the van.
Own tools and fixings
Drills, levels and wall fixings for Irish block, dot-and-dab and stud walls.

Tall units anchored
Wardrobes, bookcases and chests fixed to the wall as standard.
Weekend slots
Saturday and Sunday dates, handy after a move or a big delivery.
15+ years in the trade
Our team has assembled furniture and fitted kitchens in Dublin homes for more than 15 years.
Recent work
Wardrobes, beds, kitchens and garden builds put together by our team in Dublin homes, photographed on the day.





Compare
Assembly options compared
Three ways to get flat pack built in Dublin, side by side.
IKEA Ireland assembly service
- Furniture from other shops: IKEA products only
- How it is priced: €40 call-out plus a rate per product
- Sale items: Charged on the full retail price
- Wall anchoring: Included
- Packaging: Check when booking
- Wardrobe, TV and shelves in one visit: Separate bookings
Flat Pack Mate
- Furniture from other shops: Any retailer, new or used
- How it is priced: Fixed price per job, from €50
- Sale items: Priced on the work, not the receipt
- Wall anchoring: Included, fixings to suit the wall
- Packaging: Taken away
- Wardrobe, TV and shelves in one visit: One visit, one price
Doing it yourself
- Furniture from other shops: Any
- How it is priced: Your time
- Sale items: No difference
- Wall anchoring: Buy your own plugs
- Packaging: Recycling centre run
- Wardrobe, TV and shelves in one visit: One weekend
Reviews
What customers say about our work
Left on the Facebook page and Google listing of our lead fitter, Alex, copied as written. Scroll sideways for more.
I can't recommend Alex highly enough! He came to my rescue after a shed had been partially put up and abandoned, leaving me really worried that the structure wasn't secure and could be damaged by the wind. I gave Alex extremely short notice, but despite being incredibly busy, he went out of his way to prioritise me and make sure my shed was secured. He was professional, reliable and did an absolutely amazing job. He even worked late ...
Alex has done 2 projects in my home, and I cannot recommend him enough. he comes when he says he will, the work is *excellent* and a very good price. Highly recommended
What a fantastic service! I got 4 Ikea wardrobes assembled and they were done so quickly - very clean and tidy workers too. Highly recommend
Can't recommend Alex highly enough, assembled a wardrobe for me today, great job, great rates, thanks Alex
★★★★★
I struggled to find a carpenter who also had locksmith skills and who would actually show up, so I reached out to Alex for help. Despite his busy schedule and my location, he came out within two days. Alex has done work for me over the ...
★★★★★
Excellent. Professional and friendly. Came on time. Did a great job. Very neat and tidy.
Service areas
Flat pack assembly across Dublin and Bray
We cover all of County Dublin plus Bray. These are the areas we work in most.
Closest to our Blackrock base
Dublin city and the north coast
West and north County Dublin
Flat pack assembly questions
Do you take the packaging away?
Yes. Every box, sheet of wrap and block of polystyrene goes in the van, so the room is clear when we finish.
Do you bring your own tools and wall fixings?
Yes. We bring drills, drivers and levels, plus a range of wall fixings for solid block, hollow block, dot-and-dab and stud walls, so the anti-tip kit can be fitted properly.
Can you assemble furniture I bought second-hand?
Yes, as long as the main panels and fittings are there. Standard screws, cam locks and dowels are easy to replace. Tell us what is missing when you call.
Do you work at weekends?
Yes. Saturday and Sunday slots are available, which suits a lot of people building furniture after a move.
How long will my furniture take to assemble?
Most single items take under an hour. A double wardrobe or a bed usually takes one to two hours, and a single IKEA PAX frame with doors and interiors two to three hours. Anchoring adds 15 to 30 minutes per tall unit.
Do you fit kitchens as well as flat pack?
Yes. We fit IKEA and any-supplier kitchens labour-only, from €1,500 for a standard kitchen, and takes the old one away. The kitchen fitters page has the details and prices.








