Is my room ready for a kitchen fitter?

9 quick yes or no questions. Each "not yet" comes with what to do about it.

  1. [01] Has the new kitchen been delivered and the boxes checked against the order?

  2. [02] Do you have the supplier's plan or the full order list with unit sizes?

  3. [03] Is it agreed who takes out the old kitchen?

  4. [04] If you have a gas hob or cooker, is a Registered Gas Installer booked to disconnect and reconnect it?

  5. [05] If sockets or circuits are moving, is a Registered Electrical Contractor booked?

  6. [06] Is a plumber lined up for water supply and waste changes?

  7. [07] Are the walls plastered and dry where the units go?

  8. [08] Is the floor finished, or is it agreed whether units go on the subfloor?

  9. [09] If you chose stone worktops, do you know when the stone company templates and fits?

Your result appears here

Answer the questions

The checklist in full

  1. 1Has the new kitchen been delivered and the boxes checked against the order? Missing or damaged parts stop a fit. Check box labels against the order list the day it arrives.
  2. 2Do you have the supplier's plan or the full order list with unit sizes? The fitter prices and builds from the plan. Ask the supplier for the plan or design code.
  3. 3Is it agreed who takes out the old kitchen? Decide whether the fitter strips it out or you clear it first, and where it goes.
  4. 4If you have a gas hob or cooker, is a Registered Gas Installer booked to disconnect and reconnect it? Only an RGI may disconnect or connect gas. Book them for before the strip-out and after the fit.
  5. 5If sockets or circuits are moving, is a Registered Electrical Contractor booked? New or altered circuits need a REC and a Completion Certificate.
  6. 6Is a plumber lined up for water supply and waste changes? The fitter sets the sink in place; water supply changes are plumber work.
  7. 7Are the walls plastered and dry where the units go? Fresh plaster needs time to dry before units and tiles go on.
  8. 8Is the floor finished, or is it agreed whether units go on the subfloor? Agree whether the floor goes under the units or up to the plinths.
  9. 9If you chose stone worktops, do you know when the stone company templates and fits? Stone is templated after the units are fixed, then fitted about 7 to 10 working days later.

Get an exact price

The tool gives a ballpark. For a firm price, send the job details and we will come back to you.

What are we assembling?

Step 1 of 2: the job and where it is

Type of job

Step 2 of 2: how to reach you

See our privacy policy.

Thanks, that's with us

We will ring you back to talk through the job. If it is urgent, call 01 230 8966.

Kitchen fitting readiness check: questions

Why check before booking a kitchen fitter?

A fit stalls when parts are missing, a gas hob has not been disconnected, or the plaster is still wet. Sorting those first keeps the fitter working and the kitchen out of action for fewer days.

Who disconnects the old gas hob?

A Registered Gas Installer. Only an RGI may disconnect or connect gas, and they should give you a Declaration of Conformance for the new connection.

Can the fitter start before the worktops arrive?

Yes for stone worktops, which are templated once the units are fixed. Laminate and wood worktops should be on site so they can be cut during the fit.